Bike just about ready
Well after all of the BS with this thing over the past month I finally have it ready to go again. I have put installed a new to me engine that has been mesaged a bit. The head has received a 5 angle valve job, been decked, had the cams degreed and used a thinner head gasket. I also figured that while it was apart I would put in a yoyodyne slipper clutch. The last thing to do will be to install the Brembo 19X18 with folding lever and put the bodywork back on. I am looking forward to finally riding this thing at VIR on 9/30 and 10/1.
|